| Date up / down sorted. |
![]() |
![]() | 2010 - Tiefgarage Schloss Koblenz, Umfang: 2 x 7000 qm Untergrund: Beton Zeitraum: März bis April 2010 Eingesetzt: Weproof Abdichtungssystem 3 mit vliesarmierter Detailabdichtung Generalplanung: von Canal | architekten & ingenieure | Koblenz | www.voncanal.de Weitere Details |
![]() |
![]() | 2007 Tiefgarage Vaihinger Markt, Vaihingen bei Stuttgart Umfang: 3.100 qm Untergrund: Beton System: WestWood Cryl Dickschichtsystem mit Strukturbelag und Markierungen |
![]() | ![]() | |
![]() |
![]() | 2005 - Columbus-center multi-stoery car park Bremerhaven, Sanierung von Dehnungsfugen (ca. 20 Meter) in der Tiefgarage. Zum Einsatz kam das vliesarmierte WestWood Cryl Abdichtungssystem. Weitere Details. |
![]() |
![]() | 2004 Underground car park of the Panorama Inn Hamburg/Billstedt Another follow-up contract after the successful refurbishment measures of 2002 – refurbishment of the hotel’s own underground car park with a total area of approx. 1200 m2. The concrete surface was first blast racked and primed. The cracks were then smoothed over and joints securely and durably coated with the fleece-reinforced WestWood Cryl Waterproofing System. The first sections coated with self-levelling mortar are visible in the background. Refurbishment has been completed. The heavy-duty Textured Coating was used on the driving lanes and white markings were applied. |
![]() | ![]() | |
![]() |
![]() | 2004 Public underg.car park of Panorama Inn-Hotel Hamburg/Billstedt Successful refurbishment measures had been carried out in 2002. This was followed by refurbishment of the first floor of a three-level underground car park, accessible to the public. The area was first blast racked, then faulty sections of the substrate were repaired. All joints, cracks and junctions received a durable and secure waterproofing layer in the form of the fleece-reinforced WestWood Cryl Waterproofing System. The driving lanes and the ramp were surfaced with the heavy-duty Textured Coating as wear layer. |
![]() | ![]() | |
![]() |
![]() | 2004 Multi-stoery car park on Bleichstrasse Düsseldorf Continuation of refurbishing measures: The three lower levels (approx. 4500 m2 in total) were also coated with the proven WestWood Cryl Thick-Layer System. A section of approx. 500 m2 was also waterproofed with fleece reinforcement. Special feature: All the levels that had been refurbished by this stage were given a coloured pedestrian guide system as a measure to increase safety and facilitate orientation. |
![]() | ![]() |
| top | letzte Aktualisierung: 21.06.2010 |



























